The UPP Pump Station is suitable for the realisation of complex, smooth and high quality precast concrete parts. As the centrepiece of the upcrete® technology, the UPP creates possibilities where other filling techniques are out of the question for reasons of quality or feasibility.
Benefits at a glance
- Easy to clean
- Finely dosed
- Suitable for concrete plants
- Fast intermediate cleaning
- Continuously adjustable feed from 0 – 777 ft³/hr
- Radio remote control included
- Software interface for automatic concrete delivery as standard
- Modular pre-hopper from 160-530 gallons
- Mixer in pre-hopper
- Automatic residual concrete level indicator
- Maintenance friendly due to fixed central lubrication
- Compact and enclosed design
- Suitable for many thixotropic media
Easy to clean
Lockable valve in pre-hopper for quick and easy cleaning of the rotor. Includes slewable pipe-bow for easy accessibility and ease of cleaning.
Modular pre-hopper
If required, the standard pre-hopper with a volume of 160 gallons can be replaced with a 530 gallons volume prehopper.
Continuously adjustable feed
Low-wear and very accurate filling of the molds is ensured through the continuously adjustable feed from0 – 705 ft³/hr.
Integrated mixer
The integrated mixer mixes the concrete again before pumping. The resulting venting of self-compacting concrete (SCC) saves time and effort.
Radio remote control
The compact duplex radio remote control is available for precise operation of the pump from different locations.
Automatic residual concrete fill level indicator
The level indicator automatically and reliably displays the remaining volume of residual concrete, thus guaranteeing maximum process reliability.
Interface for concrete supply
The scope of supply includes a permanently programmed interface with attached plug for communication with a mixer and/or a bucket conveyor.
Low maintenance
The permanently installed central lubrication ensures long-term safe operation and long maintenance intervals.
Standardised power input
With 33 kW power input and attached CEE three-phase plug, the UPP 100 is perfectly matched to the standard CEE 63 A connection available in every concrete factory.
Flexible use of media
Due to the overall design, the pump is suitable for almost all thixotropic media.
Pump car
On request also available as a mobile pump solution with larger buffer.
UPP 100
Compact pump station with 100 mm conveyor hose diameter for delivery rates up to 22 m³/h.
Technical Details
Art. No. | UPP 100 |
---|---|
Capacity (max.) | 22 m³/ h |
Compact duplex radio remote control with the following functions: | on/off, speed selector, reverse switch, |
Conveyor hose diameter (mm) | 100 |
Dimensions L x B x H ca. (mm) | 2400 x 2300 x 1800 |
Electric drive | 400 V / 50 Hz |
Filling height (mm) | 1620 |
Filling possible over | individual large reservoir (feeding via bucket conveyor or similar), ready-mix concrete truck, crane bucket |
Hopper volume (L) | 600 |
Power input | 33 kW electrical, device connector CEE 63 A directly at the pump |
Weight approx. (kg) | 5800 |
feedback on graphic display of the remote control |